These aerial views of the center property were taken after the rough grading of the roads and building pads
01/15/09 Aerial view
|
Aerial view of the center property after the rough grading of the roads and building pads
01-15-09 Aerial view
|
Aerial view of the center property after the rough grading of the roads and building pads
01-15-09 Aerial view
|
Aerial view of the center property after the rough grading of the roads and building pads
01-15-09 Aerial view
|
A segment of the main water pipe is installed
01/10/09
|
A view of the new main water pipe at the entrance to the center property
01/10/09
|
A segment of water pipe next to the trench
01/12/09
|
Montonya Road is leveled near the entrance to the property
01/10/09 Montonya Road
|
A view of the property from the site of the future Dhamma Hall
01/12/09
|
The pads for the future male residences are sprayed with water to compact them
01/14/09
|
A hydrant installed near the future male residences
01/22/09
|
Another hydrant. The roads are becoming compact and leveled
01/23/09
|
The hole is prepared for one of the three septic tanks
01/27/09
|
Another view of a hole for one of the septic tanks
01/27/09
|
Another view of the hole for one of the septic tanks
01/27/09
|
Gas lines are installed on the property
01/22/09
|
The pad for male residence 1H is cleaned out in preparation for pouring the foundation
03/31/09
|