Phase I-Construction Site
01-15-09_Aerial-view
These aerial views of the center property were taken after the rough grading of the roads and building pads

01/15/09 Aerial view
01-15-09_Aerial views of the center property
Aerial view of the center property after the rough grading of the roads and building pads

01-15-09 Aerial view
aerial3
Aerial view of the center property after the rough grading of the roads and building pads

01-15-09 Aerial view
aerial4
Aerial view of the center property after the rough grading of the roads and building pads

01-15-09 Aerial view
IMG_1477
A segment of the main water pipe is installed

01/10/09
IMG_1477A
A view of the new main water pipe at the entrance to the center property

01/10/09
IMG_1477B
A segment of water pipe next to the trench

01/12/09
IMG_1477C
Montonya Road is leveled near the entrance to the property

01/10/09 Montonya Road
IMG_1477D
A view of the property from the site of the future Dhamma Hall

01/12/09
IMG_1513
The pads for the future male residences are sprayed with water to compact them

01/14/09
IMG_1534
A hydrant installed near the future male residences

01/22/09
IMG_1534A
Another hydrant. The roads are becoming compact and leveled

01/23/09
IMG_1534B
The hole is prepared for one of the three septic tanks

01/27/09
IMG_1534C
Another view of a hole for one of the septic tanks

01/27/09
IMG_1534D
Another view of the hole for one of the septic tanks

01/27/09
IMG_1535
Gas lines are installed on the property

01/22/09
March24-CleanoutMens1H
The pad for male residence 1H is cleaned out in preparation for pouring the foundation

03/31/09